Technology brief
Confirm the client expectation for lighting control, audio, Wi-Fi, CCTV, access control, cinema, gate control, remote support and future expansion before drawings become fixed.

DG Technologies
A practical reference for planning hidden AV, automation, CCTV, Wi-Fi, lighting-control and support infrastructure before finishes make changes expensive.
Why this matters
Premium residential technology should support the architecture, not fight it. The clean result clients expect depends on decisions that are often invisible on the finished project: rack space, conduit routes, ceiling coordination, power recovery, cable labels, access point positions, camera views and lighting circuit logic.
This guide gives architects a practical checklist for early-stage coordination. It is not intended to turn the architect into the AV contractor. It simply shows which decisions should be protected before the build reaches the point where every change affects finishes, joinery, ceilings or exterior aesthetics.
Design-stage inputs
Confirm the client expectation for lighting control, audio, Wi-Fi, CCTV, access control, cinema, gate control, remote support and future expansion before drawings become fixed.
Allocate a serviceable technical space with power, ventilation, cable entry, network access and enough working clearance for future support.
Plan routes before walls, slabs, ceilings, driveways and joinery make changes expensive or visually disruptive.
Coordinate speakers, access points, cameras, lighting, HVAC slots, beams, bulkheads and ceiling access panels before final reflected ceiling plans are locked.
Architectural allowances
These items reduce late-stage compromise and make the home easier to support years after handover.
Dedicated, ventilated, serviceable space for routers, switches, control processors, CCTV recorders, audio equipment and power protection.
Wired routes for Wi-Fi access points, TVs, desks, cameras, gate stations, touch panels and key equipment locations.
Ceiling or wall speaker positions coordinated with lighting, HVAC, ceiling details and room usage.
Camera positions planned around evidence, glare, height, weather, driveway/gate views and exterior aesthetics.
Circuit grouping, relay/dimmer decisions, keypad positions and LED load compatibility considered before DB and switch locations are final.
Spare routes to likely upgrade areas such as gates, patios, cinemas, studies, garages, cottages, network cabinets and roof spaces.
Allowances for router, switch, fibre, CCTV and automation recovery under South African power conditions.
Drawings, cable schedules, rack records, device lists and support notes retained for the owner and future contractors.
Coordination timeline
Working style
DG Technologies works best when involved before the technology becomes urgent. We can review plans, mark up likely infrastructure requirements, coordinate with the electrical contractor and help protect finished surfaces from late changes.
The final client experience should be simple: reliable Wi-Fi, clean control, useful lighting scenes, discreet CCTV, maintainable racks and records that make sense to the homeowner, architect, builder and future support technician.
Send the plans before the build is locked down. We'll help identify the routes, spaces and allowances that protect the finished result.